Company · Why Now
The building changed faster than the tools that run it.
AI density, GPU economics and power contracts turned every fault into money within the hour. Planning, building and operating still happen in separate tools that do not share a record, so the answer to who is affected and what it costs still arrives after the call.
What actually changed
Four things changed, and the toolchain changed with none of them.
Density went up by an order of magnitude
AI racks run at 40–60 kW on liquid loops. A cooling fault that once left hours to respond now leaves minutes.
The workload became coupled
A training job spans hundreds of GPUs. One failed GPU or one flapping rail stops or slows every one of them.
Power became the constraint and the bill
Capacity is sold by the kW and bought under take-or-pay floors and demand charges. Idle contracted power is paid either way.
Customers buy uptime by the hour
SLAs on cabinets and GPU-hours turn minutes of impact into credits. Someone has to say whose service and what it costs, during the call.
The shift, side by side
The same estate, before and after.
Our position
More dashboards are not the answer. One shared record is.
AI on one tool sees half of an event
An assistant inside the BMS cannot know the tenant. One inside the ticketing tool cannot see the busway. A useful answer needs the whole chain, from the utility feed to the invoice.
Waiting moves the start date, not the risk
Every hall planned and built on separate records adds to the reconciliation later. The estate model is cheapest to start before the next hall, not after it.
Being straight with you
What we are not going to claim
- SynapseDC never controls plant. Breakers, generators and cooling stay with your BMS and your people; disruptive steps wait for a named approver.
- It does not ask you to replace a BMS, DCIM or ITSM that works. It reads from them and adds what they cannot do.
- The first release is for colocation and GPU cloud operators. Cloud, enterprise and telco datacenters follow on the same estate model.
Questions we get asked
Frequently asked questions
Is this only for new AI halls?
No. Existing halls come first: the estate model covers legacy rooms, air-cooled racks and older plant as well as liquid-cooled GPU pods.
Do we have to change the tools we run?
No. SynapseDC reads from the BMS, power, cooling, network and GPU sources with a read-only role and syncs with your ITSM and CRM.
How quickly can we see it on our own estate?
A one-site pilot follows four steps: discovery, site survey and data, connect, go-live. How it works lists what each step needs.
Start with one site, not a rollout.
Pick one site and two situations your team keeps dealing with. We connect it and agree what the pilot should prove.